Africa50 Financed Transmission Lines
Project Brief
PIP for development of:
a) 177km of 400 kV Loosuk – Lessos transmission line;
b) 64 km of 220kV Kisumu-Musaga transmission lines;
c) Includes associated infrastructure such as substations, including a new 400kV switch station at Loosuk, new substations 220/33kV at Kakamega and substation extensions at Lessos, Musaga and Kibos
Contracting Authority
KETRACO
Contractual Arrangement
Build - Own - Operate - Transfer
Sector
Energy
Contract Term
30yrs
Private Party
Africa 50 and PowerGrid
Estimated Project Value" KES Billion (1USD =130 KES)"
41.59
Status
Negotiations ongoing.